Complex problem (6) | ![]() |
Problem (350) | ![]() |
Problem analysis (4) | ![]() |
Problem-solving (25) | ![]() |
Potential problem analysis is used also widely. All the methods follow the general structure and demands of the technical risk analysis as defined in the standard IEC 60300-3-9 20 (see Fig. 3). The prerequisites for a successful risk assessment are:
In INNORISK project PPA (Potential Problem analysis) is seen as an example of a brainstorming method that can be used to explode the prevailing mind-set in the opportunity recognition and analysis 29.
, the recruitment phase, the generation phase Standards BS 8800, OHSAS 18001, ISO guides, IEC standards None existing, creative openness Methods Hazop Potential problem analysis
a tool for situational analysis, J. Long Range Plann. 15 (2)( 1982) 12 14.33 M. Reunanen, Potential problem analysis, in:
< Back - Next >
Overtext Web Module V3.0 Alpha
Copyright Semantic-Knowledge, 1994-2011